I continued with the cooling system, fitting the expansion tank. 2x 6mm rivnuts into the ali mount and bolted through from the inside of the scuttle with repair washers to spread the load. I drilled through the plastic tab and another 6mm rivnut, bolt and trimmed repair washer. The tank provided has an extra 10mm coupling that has to be blanked, this will have to be fitted later when it arrives from Westfield.
Only 1hr as James was way Young Leadering and I was on taxi duty - total 109 hrs.
No comments:
Post a Comment