The master brakes are now installed all bled and the handbrake fitted although it still needs a warning switch fitted.
The fuel sender has been extended and the fuel tank installed.
I've also installed the side repeaters - into the alloy pontoon in order to allow for easy scuttle removal at a later date.
I've installed the main wiring loom although the gauges still need some connecting up.
I've installed the radiator - new rather than from the donor.
And also found some nice period switch labels rather than dyno tape hopefully they'll be okay for the IVA.
No comments:
Post a Comment